ITAC Assessment: CO0082
ITAC logo
ITAC Assessment: CO0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BREADS AND BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,015 3,648,886
kWh
Natural Gas $171,526 42,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $6,799 $2,000 $6,799
-
kWh
-
02 2.3191: Use demand controller or load shedder $7,490 $600 $10,092
43,962
kWh
$(-2,602.0)
-
MMBtu
03 2.2711: Utilize outside air instead of conditioned air for drying $8,099 $12,000 - $8,099
-
MMBtu
04 2.2121: Increase amount of condensate returned $6,600 $6,000 - $6,600
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $2,860 - - $2,860
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,746 $300 - $1,746
-
MMBtu
07 2.1222: Install turbulators $1,574 $600 - $1,574
-
MMBtu
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,137 $200 $4,137
84,115
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $865 $300 $865
17,585
kWh
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,169 $100 $1,169
23,740
kWh
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,008 $100 $1,008
20,516
kWh
-
12 2.4312: Improve lubrication practices $3,325 - $3,325
67,702
kWh
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $4,706 $1,116 $4,706
95,838
kWh
-
TOTAL RECOMMENDED $50,378 $23,316 $32,101
353,458
kWh
$18,277
-
MMBtu
TOTAL IMPLEMENTED $24,665 $8,716 $11,885
241,794
kWh
$12,780
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs