ITAC Assessment: MI0067
ITAC logo
ITAC Assessment: MI0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum Anodizing
NAICS 331313: Alumina Refining and Primary Aluminum Production
SIC 3334: Primary Production of Aluminum
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 10,792
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $41,274 664,260
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $420 $726 $420
5,994
kWh
02 2.1134: Eliminate leaks in combustible gas lines $1,681 $17 $1,681
24,009
kWh
03 2.2514: Cover open tanks $62 $120 $62
890
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $75 $267 $75
1,069
kWh
05 2.6218: Turn off equipment when not in use $9,230 $175 $9,230
131,861
kWh
TOTAL RECOMMENDED $11,468 $1,305 $11,468
163,823
kWh
TOTAL IMPLEMENTED $2,163 $863 $2,163
30,893
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs