| Assessment Year | 1986 |
|---|---|
| Principal Product | BOTTLED MILK |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 7,000
Tgal
|
| Production Hrs. Annual | 2,964
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,393 | 1,308,031 |
kWh
|
$0.061 |
| Natural Gas | $53,932 | 12,797 |
MMBtu
|
$4.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,662 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,207 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7233: Use properly designed and sized hvac equipment | $3,878 | $200 |
$3,878
63,892
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $648 | $300 | - |
$648
-
MMBtu
|
|
| 03 | 2.7231: Use radiant heater for spot heating | $2,349 | $7,000 | - |
$2,349
-
MMBtu
|
|
| 04 | 2.4312: Improve lubrication practices | $2,455 | - |
$2,455
40,445
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,455 | $2,400 |
$2,455
40,445
kWh
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $3,393 | $950 | - |
$3,393
-
MMBtu
|
|
| 07 | 2.2135: Repair and eliminate steam leaks | $1,760 | $200 | - |
$1,760
-
MMBtu
|
|
| 08 | 2.7261: Install timers and/or thermostats | $1,323 | $188 |
$498
8,206
kWh
|
$825
-
MMBtu
|
|
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $729 | $100 |
$729
12,016
kWh
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $178 | $200 |
$178
2,931
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $480 | $744 |
$480
7,913
kWh
|
- | |
| 12 | 2.2511: Insulate bare equipment | $1,014 | $860 |
$1,014
16,706
kWh
|
- | |
| TOTAL RECOMMENDED | $20,662 | $13,142 |
$11,687
192,554
kWh
|
$8,975
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,207 | $13,142 |
$9,232
152,109
kWh
|
$8,975
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs