ITAC Assessment: CO0073
ITAC logo
ITAC Assessment: CO0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BULK AND PACKAGED FLOUR
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 1,800
ton
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $778,498 16,123,974
kWh
Natural Gas $45,593 9,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $30,451 - $30,451
630,715
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,376 $21,600 $20,376
422,040
kWh
- -
03 2.2437: Recover waste heat from equipment $15,180 $3,000 $(-910.0)
(-19,050)
kWh
$16,090
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,061 $200 $7,061
146,249
kWh
- -
05 2.2441: Preheat boiler makeup water with waste process heat $3,212 $800 - $3,212
-
MMBtu
-
06 2.7221: Lower temperature during the winter season and vice-versa $2,876 $4 $453
9,379
kWh
$2,423
-
MMBtu
-
07 2.3191: Use demand controller or load shedder $2,505 $600 $2,505
-
kWh
- -
08 3.4154: Eliminate leaks in water lines and valves $1,183 - - - $1,183
09 2.1233: Analyze flue gas for proper air/fuel ratio $999 $300 - $999
-
MMBtu
-
10 2.6212: Turn off equipment during breaks, reduce operating time $382 $50 $382
7,913
kWh
- -
11 2.6232: Install set-back timers $3,538 $1,879 $3,538
73,271
kWh
- -
TOTAL RECOMMENDED $87,763 $28,433 $63,856
1,270,517
kWh
$22,724
-
MMBtu
$1,183
TOTAL IMPLEMENTED $64,882 $6,233 $40,975
848,477
kWh
$22,724
-
MMBtu
$1,183
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs