ITAC Assessment: CO0060
ITAC logo
ITAC Assessment: CO0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PACKAGED MEAT & DELI
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area
n/a
Annual Production 115,000
lb
Production Hrs. Annual 7,072
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,517 6,941,970
kWh
Natural Gas $50,238 11,975
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $17,780 $25,000 $17,780
-
kWh
-
02 2.4312: Improve lubrication practices $9,623 - $9,623
215,123
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,357 $300 - $1,357
-
MMBtu
04 2.1222: Install turbulators $1,466 $750 - $1,466
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $433 $25 $433
9,672
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $2,202 $800 $2,202
49,238
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $734 $930 $734
16,413
kWh
-
08 2.7442: Keep doors and windows shut when not on use $1,390 $25 $1,390
31,067
kWh
-
09 2.2437: Recover waste heat from equipment $1,697 $1,000 - $1,697
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $14,473 $17,000 $14,473
323,564
kWh
-
TOTAL RECOMMENDED $51,155 $45,830 $46,635
645,077
kWh
$4,520
-
MMBtu
TOTAL IMPLEMENTED $18,694 $19,255 $15,640
349,649
kWh
$3,054
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs