ITAC Assessment: CO0045
ITAC logo
ITAC Assessment: CO0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COMPUTERS,WORD PROCESSOR
NAICS
n/a
SIC 3571: Electronic Computers
Sales Range $100
M
to 500
M
# of Employees 900
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,729 7,012,896
kWh
Natural Gas $37,806 9,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,273 $1,500 $15,273
-
kWh
- $(-4,000.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,736 $300 - $1,736
-
MMBtu
-
03 2.7221: Lower temperature during the winter season and vice-versa $3,875 $200 - $3,875
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $559 $400 $559
12,309
kWh
- -
05 2.7444: Close holes and openings in building such as broken windows $440 $300 $440
9,672
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,215 $6,411 $11,215
246,776
kWh
- -
TOTAL RECOMMENDED $29,098 $9,111 $27,487
268,757
kWh
$5,611
-
MMBtu
$(-4,000.0)
TOTAL IMPLEMENTED $13,391 $7,011 $11,655
256,448
kWh
$1,736
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs