Assessment Year | 1985 |
---|---|
Principal Product | PHARMACEUTICAL INTERMEDS |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 200,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $439,599 | 10,509,965 |
kWh
|
$0.042 |
Natural Gas | $412,692 | 97,665 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,559 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $23,355 | $520 |
$809
19,343
kWh
|
$22,546
-
MMBtu
|
|
02 | 2.3191: Use demand controller or load shedder | $1,657 | $2,400 |
$1,657
-
kWh
|
- | |
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $14,427 | $25,000 | - |
$14,427
-
MMBtu
|
|
04 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $22,508 | $40,000 | - |
$22,508
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,490 | $500 | - |
$10,490
-
MMBtu
|
|
06 | 2.7262: Separate controls of air handlers from ac/ heating systems | $503 | $400 |
$503
12,016
kWh
|
- | |
07 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $964 | $20,000 | - |
$964
-
MMBtu
|
|
08 | 2.1222: Install turbulators | $8,655 | $1,700 | - |
$8,655
-
MMBtu
|
|
TOTAL RECOMMENDED | $82,559 | $90,520 |
$2,969
31,359
kWh
|
$79,590
-
MMBtu
|
||
TOTAL IMPLEMENTED | $80,902 | $88,120 |
$1,312
31,359
kWh
|
$79,590
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs