ITAC Assessment: CO0039
ITAC logo
ITAC Assessment: CO0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PHARMACEUTICAL INTERMEDS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 200,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,599 10,509,965
kWh
Natural Gas $412,692 97,665
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,902

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $23,355 $520 $809
19,343
kWh
$22,546
-
MMBtu
02 2.3191: Use demand controller or load shedder $1,657 $2,400 $1,657
-
kWh
-
03 2.2443: Re-use or recycle hot or cold process exhaust air $14,427 $25,000 - $14,427
-
MMBtu
04 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $22,508 $40,000 - $22,508
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $10,490 $500 - $10,490
-
MMBtu
06 2.7262: Separate controls of air handlers from ac/ heating systems $503 $400 $503
12,016
kWh
-
07 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $964 $20,000 - $964
-
MMBtu
08 2.1222: Install turbulators $8,655 $1,700 - $8,655
-
MMBtu
TOTAL RECOMMENDED $82,559 $90,520 $2,969
31,359
kWh
$79,590
-
MMBtu
TOTAL IMPLEMENTED $80,902 $88,120 $1,312
31,359
kWh
$79,590
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs