ITAC Assessment: CO0033
ITAC logo
ITAC Assessment: CO0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product TRANSISTORS,DIODES
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 4,220
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,507 7,643,611
kWh
Natural Gas $56,061 11,353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $27,000 $399 $4,486
89,683
kWh
$22,514
-
MMBtu
02 2.7314: Reduce ventilation air $7,279 $824 $1,200
24,033
kWh
$6,079
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $2,343 $4,000 $2,343
46,893
kWh
-
04 2.2437: Recover waste heat from equipment $1,584 $3,500 - $1,584
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $655 $3,000 - $655
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $173 $200 $173
3,517
kWh
-
07 2.7492: Use proper thickness of insulation on building envelope $134 $162 - $134
-
MMBtu
08 2.7111: Reduce illumination to minimum necessary levels $4,006 $3,619 $4,006
81,184
kWh
-
TOTAL RECOMMENDED $43,174 $15,704 $12,208
245,310
kWh
$30,966
-
MMBtu
TOTAL IMPLEMENTED $41,590 $12,204 $12,208
245,310
kWh
$29,382
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs