| Assessment Year | 1985 |
|---|---|
| Principal Product | TRANSISTORS,DIODES |
| NAICS |
n/a
|
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 40,000,000
pieces
|
| Production Hrs. Annual | 4,220
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $382,507 | 7,643,611 |
kWh
|
$0.050 |
| Natural Gas | $56,061 | 11,353 |
MMBtu
|
$4.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $41,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $27,000 | $399 |
$4,486
89,683
kWh
|
$22,514
-
MMBtu
|
|
| 02 | 2.7314: Reduce ventilation air | $7,279 | $824 |
$1,200
24,033
kWh
|
$6,079
-
MMBtu
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,343 | $4,000 |
$2,343
46,893
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,584 | $3,500 | - |
$1,584
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $655 | $3,000 | - |
$655
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $173 | $200 |
$173
3,517
kWh
|
- | |
| 07 | 2.7492: Use proper thickness of insulation on building envelope | $134 | $162 | - |
$134
-
MMBtu
|
|
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $4,006 | $3,619 |
$4,006
81,184
kWh
|
- | |
| TOTAL RECOMMENDED | $43,174 | $15,704 |
$12,208
245,310
kWh
|
$30,966
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $41,590 | $12,204 |
$12,208
245,310
kWh
|
$29,382
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs