ITAC Assessment: CO0032
ITAC logo
ITAC Assessment: CO0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POLYURETHANE CASTER WHEELS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area
n/a
Annual Production 300,000
lb
Production Hrs. Annual 2,444
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,847 793,083
kWh
Natural Gas $10,117 2,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $816 $500 - $816
-
MMBtu
02 2.7262: Separate controls of air handlers from ac/ heating systems $816 $2,000 $816
13,482
kWh
-
03 2.7261: Install timers and/or thermostats $4,062 $596 $1,210
19,930
kWh
$2,852
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,406 - $13,727
227,433
kWh
$(-5,321.0)
-
MMBtu
05 2.3191: Use demand controller or load shedder $2,972 $3,600 $2,972
-
kWh
-
06 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $596 $1,500 - $596
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $865 $1,500 $865
14,361
kWh
-
TOTAL RECOMMENDED $18,533 $9,696 $19,590
275,206
kWh
$(-1,057.0)
-
MMBtu
TOTAL IMPLEMENTED $5,249 $8,600 $4,653
27,843
kWh
$596
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs