ITAC Assessment: CO0680
ITAC logo
ITAC Assessment: CO0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pressure sensitive tape and film
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 400,000
ft2
Annual Production 10,784
ton
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,977 10,776,413
kWh
Electricity Demand $398,519 21,602
kW-mo/yr
Electricity Fees $2,655 -
Natural Gas $247,316 59,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,930 $1,310 $13,210
214,300
kWh
$4,720
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $6,370 $31,720 - - $6,370
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $490 $230 - - $490
-
MMBtu
TOTAL RECOMMENDED $24,790 $33,260 $13,210
214,300
kWh
$4,720
-
kW-mo/yr
$6,860
-
MMBtu
TOTAL IMPLEMENTED $18,420 $1,540 $13,210
214,300
kWh
$4,720
-
kW-mo/yr
$490
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs