ITAC Assessment: CO0030
ITAC logo
ITAC Assessment: CO0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PROCESSED HAM
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 332
Plant Area
n/a
Annual Production 70,200,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $448,919 9,924,092
kWh
Natural Gas $291,630 63,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,761 $300 - $4,761
-
MMBtu
02 2.1222: Install turbulators $4,405 $400 - $4,405
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $6,575 $10,000 - $6,575
-
MMBtu
04 2.3191: Use demand controller or load shedder $14,492 $3,000 $14,492
-
kWh
-
05 2.2136: Install / repair insulation on steam lines $5,420 $1,072 - $5,420
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $751 $400 - $751
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $730 $200 $730
16,120
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,640 $1,485 $4,640
102,579
kWh
-
09 2.7111: Reduce illumination to minimum necessary levels $5,211 $350 $5,211
115,182
kWh
-
TOTAL RECOMMENDED $46,985 $17,207 $25,073
233,881
kWh
$21,912
-
MMBtu
TOTAL IMPLEMENTED $40,410 $7,207 $25,073
233,881
kWh
$15,337
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs