Assessment Year | 1985 |
---|---|
Principal Product | PROCESSED HAM |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 332 |
Plant Area |
n/a
|
Annual Production | 70,200,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $448,919 | 9,924,092 |
kWh
|
$0.045 |
Natural Gas | $291,630 | 63,644 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,410 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,761 | $300 | - |
$4,761
-
MMBtu
|
|
02 | 2.1222: Install turbulators | $4,405 | $400 | - |
$4,405
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $6,575 | $10,000 | - |
$6,575
-
MMBtu
|
|
04 | 2.3191: Use demand controller or load shedder | $14,492 | $3,000 |
$14,492
-
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $5,420 | $1,072 | - |
$5,420
-
MMBtu
|
|
06 | 2.2122: Install / repair insulation on condensate lines | $751 | $400 | - |
$751
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $730 | $200 |
$730
16,120
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,640 | $1,485 |
$4,640
102,579
kWh
|
- | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $5,211 | $350 |
$5,211
115,182
kWh
|
- | |
TOTAL RECOMMENDED | $46,985 | $17,207 |
$25,073
233,881
kWh
|
$21,912
-
MMBtu
|
||
TOTAL IMPLEMENTED | $40,410 | $7,207 |
$25,073
233,881
kWh
|
$15,337
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs