Assessment Year | 1985 |
---|---|
Principal Product | DENTAL HARDWARE |
NAICS |
n/a
|
SIC | 3843: Dental Equipment and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 325 |
Plant Area |
n/a
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,256 | 1,890,973 |
kWh
|
$0.066 |
Natural Gas | $34,901 | 7,051 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,177 | $6,312 |
$5,177
78,253
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,652 | $300 | - |
$1,652
-
MMBtu
|
|
03 | 2.3191: Use demand controller or load shedder | $5,931 | $3,500 |
$5,931
-
kWh
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $49 | $50 |
$49
879
kWh
|
- | |
05 | 2.7226: Use computer programs to optimize hvac performance | $20,318 | $25,000 |
$10,716
161,782
kWh
|
$9,602
-
MMBtu
|
|
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $519 | $3,500 | - |
$519
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $932 | $200 |
$564
8,499
kWh
|
$368
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $165 | $200 |
$165
2,638
kWh
|
- | |
09 | 2.2612: Use cooling tower water instead of refrigeration | $373 | $2,000 |
$373
5,569
kWh
|
- | |
TOTAL RECOMMENDED | $35,116 | $41,062 |
$22,975
257,620
kWh
|
$12,141
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,312 | $31,812 |
$16,058
242,673
kWh
|
$11,254
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs