ITAC Assessment: CO0026
ITAC logo
ITAC Assessment: CO0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product DENTAL HARDWARE
NAICS
n/a
SIC 3843: Dental Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,256 1,890,973
kWh
Natural Gas $34,901 7,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,177 $6,312 $5,177
78,253
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,652 $300 - $1,652
-
MMBtu
03 2.3191: Use demand controller or load shedder $5,931 $3,500 $5,931
-
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $49 $50 $49
879
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $20,318 $25,000 $10,716
161,782
kWh
$9,602
-
MMBtu
06 2.2444: Use hot process fluids to preheat incoming process fluids $519 $3,500 - $519
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $932 $200 $564
8,499
kWh
$368
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $165 $200 $165
2,638
kWh
-
09 2.2612: Use cooling tower water instead of refrigeration $373 $2,000 $373
5,569
kWh
-
TOTAL RECOMMENDED $35,116 $41,062 $22,975
257,620
kWh
$12,141
-
MMBtu
TOTAL IMPLEMENTED $27,312 $31,812 $16,058
242,673
kWh
$11,254
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs