| Assessment Year | 1985 |
|---|---|
| Principal Product | DENTAL HARDWARE |
| NAICS |
n/a
|
| SIC | 3843: Dental Equipment and Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 325 |
| Plant Area |
n/a
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 3,250
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,256 | 1,890,973 |
kWh
|
$0.066 |
| Natural Gas | $34,901 | 7,051 |
MMBtu
|
$4.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,312 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,177 | $6,312 |
$5,177
78,253
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,652 | $300 | - |
$1,652
-
MMBtu
|
|
| 03 | 2.3191: Use demand controller or load shedder | $5,931 | $3,500 |
$5,931
-
kWh
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $49 | $50 |
$49
879
kWh
|
- | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $20,318 | $25,000 |
$10,716
161,782
kWh
|
$9,602
-
MMBtu
|
|
| 06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $519 | $3,500 | - |
$519
-
MMBtu
|
|
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $932 | $200 |
$564
8,499
kWh
|
$368
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $165 | $200 |
$165
2,638
kWh
|
- | |
| 09 | 2.2612: Use cooling tower water instead of refrigeration | $373 | $2,000 |
$373
5,569
kWh
|
- | |
| TOTAL RECOMMENDED | $35,116 | $41,062 |
$22,975
257,620
kWh
|
$12,141
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,312 | $31,812 |
$16,058
242,673
kWh
|
$11,254
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs