ITAC Assessment: CO0024
ITAC logo
ITAC Assessment: CO0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COATED & TREATED RAILROAD TIES
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area
n/a
Annual Production 2,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,156 1,155,041
kWh
Natural Gas $284,019 68,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $12,774 $78 - $12,774
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $2,110 $15,000 - $2,110
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $5,315 $2,000 - $5,315
-
MMBtu
04 2.2511: Insulate bare equipment $454 $1,800 - $454
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $242 $100 $242
4,103
kWh
-
06 2.3191: Use demand controller or load shedder $10,838 $900 $10,838
-
kWh
-
TOTAL RECOMMENDED $31,733 $19,878 $11,080
4,103
kWh
$20,653
-
MMBtu
TOTAL IMPLEMENTED $31,037 $17,978 $10,838
-
kWh
$20,199
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs