ITAC Assessment: CO0023
ITAC logo
ITAC Assessment: CO0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WINDOW FIXTURES
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 76
Plant Area
n/a
Annual Production 3,000
thousand feet
Production Hrs. Annual 3,250
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,194 2,090,856
kWh
Natural Gas $14,410 2,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,206 $2,724 $7,206
92,907
kWh
-
02 2.2511: Insulate bare equipment $1,114 $380 $1,114
14,361
kWh
-
03 2.2437: Recover waste heat from equipment $6,891 $5,000 - $6,891
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,690 $375 - $1,690
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $159 $20 $159
2,052
kWh
-
06 2.7261: Install timers and/or thermostats $1,957 $10,000 - $1,957
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $6,364 $100 $6,364
82,063
kWh
-
TOTAL RECOMMENDED $25,381 $18,599 $14,843
191,383
kWh
$10,538
-
MMBtu
TOTAL IMPLEMENTED $14,945 $5,475 $6,364
82,063
kWh
$8,581
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs