Assessment Year | 1984 |
---|---|
Principal Product | REBUILT ENGINES & PARTS |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,930 | 584,994 |
kWh
|
$0.079 |
Natural Gas | $27,527 | 5,221 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,487 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,627 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,635 | - |
$8,635
109,906
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $472 | $500 | - |
$472
-
MMBtu
|
|
03 | 2.3191: Use demand controller or load shedder | $3,168 | $6,000 |
$3,168
-
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $182 | $68 |
$182
2,345
kWh
|
- | |
05 | 2.7212: Install or upgrade insulation on hvac distribution systems | $543 | $493 | - |
$543
-
MMBtu
|
|
06 | 2.7492: Use proper thickness of insulation on building envelope | $372 | $800 | - |
$372
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $165 | $200 |
$165
2,052
kWh
|
- | |
08 | 2.4321: Upgrade obsolete equipment | $318 | $30 | - |
$318
-
MMBtu
|
|
09 | 2.7212: Install or upgrade insulation on hvac distribution systems | $186 | $175 | - |
$186
-
MMBtu
|
|
10 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $769 | $130 |
$769
9,672
kWh
|
- | |
11 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $6,677 | $5,000 | - |
$6,677
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,487 | $13,396 |
$12,919
123,975
kWh
|
$8,568
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,627 | $1,403 |
$9,751
123,975
kWh
|
$876
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs