Assessment Year | 1984 |
---|---|
Principal Product | MOBILE HOMES |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 360
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,941 | 570,047 |
kWh
|
$0.070 |
Natural Gas | $28,515 | 6,136 |
MMBtu
|
$4.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,751 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,327 | $459 |
$8,327
118,992
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $129 | $300 | - |
$129
-
MMBtu
|
|
03 | 2.7492: Use proper thickness of insulation on building envelope | $1,080 | $3,054 | - |
$1,080
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $327 | $250 |
$454
6,448
kWh
|
$(-127.0)
-
MMBtu
|
|
05 | 2.7441: Replace broken windows and/or window sash | $107 | $110 | - |
$107
-
MMBtu
|
|
06 | 2.3191: Use demand controller or load shedder | $4,271 | $5,000 |
$4,271
-
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $1,009 | $500 |
$544
7,913
kWh
|
$465
-
MMBtu
|
|
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $880 | $455 |
$880
12,603
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,099 | $150 |
$2,099
29,894
kWh
|
- | |
TOTAL RECOMMENDED | $18,229 | $10,278 |
$16,575
175,850
kWh
|
$1,654
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,751 | $4,573 |
$10,970
156,799
kWh
|
$1,781
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs