ITAC Assessment: CO0009
ITAC logo
ITAC Assessment: CO0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MOBILE HOMES
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 360
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,941 570,047
kWh
Natural Gas $28,515 6,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,327 $459 $8,327
118,992
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $129 $300 - $129
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $1,080 $3,054 - $1,080
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $327 $250 $454
6,448
kWh
$(-127.0)
-
MMBtu
05 2.7441: Replace broken windows and/or window sash $107 $110 - $107
-
MMBtu
06 2.3191: Use demand controller or load shedder $4,271 $5,000 $4,271
-
kWh
-
07 2.7261: Install timers and/or thermostats $1,009 $500 $544
7,913
kWh
$465
-
MMBtu
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $880 $455 $880
12,603
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,099 $150 $2,099
29,894
kWh
-
TOTAL RECOMMENDED $18,229 $10,278 $16,575
175,850
kWh
$1,654
-
MMBtu
TOTAL IMPLEMENTED $12,751 $4,573 $10,970
156,799
kWh
$1,781
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs