ITAC Assessment: CO0008
ITAC logo
ITAC Assessment: CO0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product BIO FEEDBACK EQUIPMENT
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 15,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,289 793,083
kWh
Natural Gas $12,944 2,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,129 $3,063 $4,129
67,702
kWh
-
02 2.3191: Use demand controller or load shedder $3,146 $4,000 $3,146
-
kWh
-
03 2.7261: Install timers and/or thermostats $6,065 $597 $1,810
29,601
kWh
$4,255
-
MMBtu
04 2.2437: Recover waste heat from equipment $305 $200 - $305
-
MMBtu
05 2.7212: Install or upgrade insulation on hvac distribution systems $253 $24 $12
293
kWh
$241
-
MMBtu
06 2.7262: Separate controls of air handlers from ac/ heating systems $1,255 $500 $1,255
20,516
kWh
-
TOTAL RECOMMENDED $15,153 $8,384 $10,352
118,112
kWh
$4,801
-
MMBtu
TOTAL IMPLEMENTED $11,449 $4,160 $7,194
117,819
kWh
$4,255
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs