| Assessment Year | 1984 |
|---|---|
| Principal Product | INJECTION MOLDED PARTS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 400,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $42,477 | 766,120 |
kWh
|
$0.055 |
| Natural Gas | $6,023 | 1,205 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,865 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,041 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,113 | $1,027 |
$3,113
55,979
kWh
|
- | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,622 | $5,000 |
$2,622
-
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $202 | $250 |
$202
3,517
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $412 | $828 | - |
$412
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $2,026 | $130 |
$286
5,275
kWh
|
$1,740
-
MMBtu
|
|
| 07 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,490 | $2,900 |
$1,490
26,671
kWh
|
- | |
| TOTAL RECOMMENDED | $9,865 | $10,135 |
$7,713
91,442
kWh
|
$2,152
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,041 | $4,885 |
$4,889
87,925
kWh
|
$2,152
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs