ITAC Assessment: CO0005
ITAC logo
ITAC Assessment: CO0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INJECTION MOLDED PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,477 766,120
kWh
Natural Gas $6,023 1,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,113 $1,027 $3,113
55,979
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,622 $5,000 $2,622
-
kWh
-
04 2.2511: Insulate bare equipment $202 $250 $202
3,517
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $412 $828 - $412
-
MMBtu
06 2.7261: Install timers and/or thermostats $2,026 $130 $286
5,275
kWh
$1,740
-
MMBtu
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,490 $2,900 $1,490
26,671
kWh
-
TOTAL RECOMMENDED $9,865 $10,135 $7,713
91,442
kWh
$2,152
-
MMBtu
TOTAL IMPLEMENTED $7,041 $4,885 $4,889
87,925
kWh
$2,152
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs