Assessment Year | 1984 |
---|---|
Principal Product | MILK,SOUR CREAM,ICE CREAM |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 6,600,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,284 | 557,151 |
kWh
|
$0.056 |
Natural Gas | $17,714 | 4,169 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,990 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,060 | $300 | - |
$5,060
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,272 | $2,500 | - |
$1,272
-
MMBtu
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $594 | $118 |
$594
10,551
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,430 | $500 |
$2,130
37,808
kWh
|
$(-700.0)
-
MMBtu
|
- | |
05 | 2.1222: Install turbulators | $1,594 | $1,100 | - |
$1,594
-
MMBtu
|
- | |
06 | 2.2437: Recover waste heat from equipment | $435 | $800 | - |
$435
-
MMBtu
|
- | |
07 | 2.2711: Utilize outside air instead of conditioned air for drying | $410 | $300 |
$410
7,327
kWh
|
- | - | |
08 | 2.2121: Increase amount of condensate returned | $1,765 | $1,494 | - |
$1,055
-
MMBtu
|
$710 | |
09 | 2.2136: Install / repair insulation on steam lines | $1,045 | $635 | - |
$1,045
-
MMBtu
|
- | |
10 | 2.7441: Replace broken windows and/or window sash | $385 | $1,494 | - |
$385
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $13,990 | $9,241 |
$3,134
55,686
kWh
|
$10,146
-
MMBtu
|
$710 | ||
TOTAL IMPLEMENTED | $13,990 | $9,241 |
$3,134
55,686
kWh
|
$10,146
-
MMBtu
|
$710 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs