ITAC Assessment: CM1053
ITAC logo
ITAC Assessment: CM1053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bus maintenance facility
NAICS 485111: Mixed Mode Transit Systems
SIC 4111: Local and Suburban Transit
Sales Range less than $500
k
# of Employees 50
Plant Area 400,000
ft2
Annual Production 36,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,849 5,124,604
kWh
Electricity Demand $195,658 8,167
kW-mo/yr
Electricity Fees $15,788 -
Natural Gas $3,486 388
MMBtu
Waste Disposal Costs
Water Usage $81,910 7,800
Tgal
TOTAL YEARLY COSTS $497,692
RECOMMENDED SAVINGS* $59,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,499 $81,585 $9,780
249,533
kWh
$16,719
-
kW-mo/yr
- -
02 2.9114: Use solar heat to make electricty $14,804 $82,205 $14,804
330,298
kWh
- - -
03 2.4226: Use / purchase optimum sized compressor $14,192 $65,292 $8,824
88,160
kWh
$5,368
-
kW-mo/yr
- -
04 3.4151: Minimize water usage $3,382 $10,387 - - - $3,382
-
Tgal
05 2.4221: Install compressor air intakes in coolest locations $524 $4,942 $524
13,367
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $205 $182 $112
2,846
kWh
$94
-
kW-mo/yr
- -
07 2.2136: Install / repair insulation on steam lines $239 $200 - - $239
-
MMBtu
-
TOTAL RECOMMENDED $59,846 $244,793 $34,044
684,203
kWh
$22,181
-
kW-mo/yr
$239
-
MMBtu
$3,382
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs