| Assessment Year | 2025 |
|---|---|
| Principal Product | Wood Cabinetry |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
51,000
ft2
|
| Annual Production | 30,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $43,923 | 555,300 |
kWh
|
$0.079 |
| Electricity Demand | $74,572 | 3,045 |
kW-mo/yr
|
$24.49 |
| Electricity Fees | $4,125 | - |
|
- |
| Natural Gas | $11,928 | 1,035 |
MMBtu
|
$11.52 |
| TOTAL YEARLY COSTS | $134,548 | |||
| RECOMMENDED SAVINGS* | $20,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4113: Install motor voltage controller on lightly loaded motors | $15,240 | $23,161 |
$6,534
82,610
kWh
|
$8,706
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,059 | $3,255 |
$1,059
13,389
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,106 | $133 |
$440
5,570
kWh
|
$666
-
kW-mo/yr
|
- | |
| 04 | 2.7131: Add area lighting switches | $271 | $26 |
$271
3,439
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $571 | $50 |
$234
2,960
kWh
|
$337
-
kW-mo/yr
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $194 | $2,126 |
$194
2,457
kWh
|
- | - | |
| 07 | 2.7131: Add area lighting switches | $84 | $203 |
$84
1,066
kWh
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $85 | $1,276 |
$26
331
kWh
|
$59
-
kW-mo/yr
|
- | |
| 09 | 2.7221: Lower temperature during the winter season and vice-versa | $1,545 | $138 | - | - |
$1,545
-
MMBtu
|
|
| TOTAL RECOMMENDED | $20,155 | $30,368 |
$8,842
111,822
kWh
|
$9,768
-
kW-mo/yr
|
$1,545
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs