ITAC Assessment: TT0286
ITAC logo
ITAC Assessment: TT0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Snack Cakes
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 496
Plant Area 265,000
ft2
Annual Production 94,425,829
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $651,702 12,254,131
kWh
Electricity Demand $333,676 35,102
kW-mo/yr
Electricity Fees $(-96,203.0) -
Natural Gas $645,742 99,156
MMBtu
Waste Disposal Costs
Water Usage $110,900 20,260
Tgal
Water Disposal $83,664 20,260
Tgal
TOTAL YEARLY COSTS $1,729,481
RECOMMENDED SAVINGS* $107,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $32,010 $18,000 $32,010
601,695
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,768 $37,360 $12,400
233,072
kWh
$4,368
-
kW-mo/yr
- -
03 2.1231: Establish burner maintenance schedule for boilers $15,950 $900 - - - $15,950
-
MMBtu
04 2.2511: Insulate bare equipment $15,688 $1,229 - - - $15,688
-
MMBtu
05 2.3212: Optimize plant power factor $12,412 $17,500 - - $12,412 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,747 $1,210 $6,747
126,819
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,352 $3,450 $5,352
100,590
kWh
- - -
08 2.7229: Air condition only space necessary $2,551 $3,200 $2,551
47,960
kWh
- - -
TOTAL RECOMMENDED $107,478 $82,849 $59,060
1,110,136
kWh
$4,368
-
kW-mo/yr
$12,412 $31,638
-
MMBtu
TOTAL IMPLEMENTED $75,022 $44,260 $46,660
877,064
kWh
- $12,412 $15,950
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs