ITAC Assessment: CM1032
ITAC logo
ITAC Assessment: CM1032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product None
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range less than $500
k
# of Employees 233
Plant Area 69,946
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,083 590,463
kWh
Electricity Demand $38,894 1,953
kW-mo/yr
Electricity Fees $9,660 -
Natural Gas $30,834 2,829
MMBtu
Waste Disposal Costs
Water Usage $17,106 1,682
Tgal
TOTAL YEARLY COSTS $124,577
RECOMMENDED SAVINGS* $22,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $21,637 $228,835 $13,032
273,781
kWh
$8,605
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $309 $1,170 $196
4,120
kWh
$113
-
kW-mo/yr
03 2.7131: Add area lighting switches $133 $915 $133
2,793
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $37 $120 $37
782
kWh
-
TOTAL RECOMMENDED $22,116 $231,040 $13,398
281,476
kWh
$8,718
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs