ITAC Assessment: CM1031
ITAC logo
ITAC Assessment: CM1031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hotel Services
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area 155,496
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,564 5,603,010
kWh
Electricity Demand $219,398 11,252
kW-mo/yr
Electricity Fees $102,186 -
Natural Gas $238,056 26,315
MMBtu
Waste Disposal Costs
Water Usage $188,057 21,838
Tgal
TOTAL YEARLY COSTS $1,015,262
RECOMMENDED SAVINGS* $81,111 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 3.4113: Treat and reuse rinse waters $80,106 $200,135 - - - $32,245
-
Tgal
$47,861
-
Tgal
02 2.2211: Use optimum temperature $626 - - - $626
-
MMBtu
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $171 $149 $6
128
kWh
- $165
-
MMBtu
- -
04 2.2694: Use highest temperature for chilling or cold storage $92 - $59
1,226
kWh
$33
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $79 - $79
1,643
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $37 $405 - - $37
-
MMBtu
- -
TOTAL RECOMMENDED $81,111 $200,689 $144
2,997
kWh
$33
-
kW-mo/yr
$828
-
MMBtu
$32,245
-
Tgal
$47,861
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs