ITAC Assessment: UA0023
ITAC logo
ITAC Assessment: UA0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product voltage transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 71,000
ft2
Annual Production 67,872
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,002 1,367,400
kWh
Electricity Demand $39,737 3,687
kW-mo/yr
Natural Gas $49,409 4,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $3,336 $3,900 - - $3,336
-
MMBtu
02 2.4133: Use most efficient type of electric motors $76 $325 $76
1,452
kWh
- -
03 2.4321: Upgrade obsolete equipment $35,422 $4,000 $11,091
212,318
kWh
$24,331
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $110 $272 $110
2,111
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $557 $1,000 $248
4,742
kWh
$309
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $896 - $370
7,090
kWh
$526
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $900 $1,552 $402
7,687
kWh
$498
-
kW-mo/yr
-
08 2.2437: Recover waste heat from equipment $1,578 $1,570 - - $1,578
-
MMBtu
TOTAL RECOMMENDED $42,875 $12,619 $12,297
235,400
kWh
$25,664
-
kW-mo/yr
$4,914
-
MMBtu
TOTAL IMPLEMENTED $41,903 $12,294 $11,851
226,858
kWh
$25,138
-
kW-mo/yr
$4,914
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs