Assessment Year | 2008 |
---|---|
Principal Product | voltage transformers |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
71,000
ft2
|
Annual Production | 67,872
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,002 | 1,367,400 |
kWh
|
$0.062 |
Electricity Demand | $39,737 | 3,687 |
kW-mo/yr
|
$10.78 |
Natural Gas | $49,409 | 4,747 |
MMBtu
|
$10.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,903 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $3,336 | $3,900 | - | - |
$3,336
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $76 | $325 |
$76
1,452
kWh
|
- | - | |
03 | 2.4321: Upgrade obsolete equipment | $35,422 | $4,000 |
$11,091
212,318
kWh
|
$24,331
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $110 | $272 |
$110
2,111
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $557 | $1,000 |
$248
4,742
kWh
|
$309
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $896 | - |
$370
7,090
kWh
|
$526
-
kW-mo/yr
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $900 | $1,552 |
$402
7,687
kWh
|
$498
-
kW-mo/yr
|
- | |
08 | 2.2437: Recover waste heat from equipment | $1,578 | $1,570 | - | - |
$1,578
-
MMBtu
|
|
TOTAL RECOMMENDED | $42,875 | $12,619 |
$12,297
235,400
kWh
|
$25,664
-
kW-mo/yr
|
$4,914
-
MMBtu
|
||
TOTAL IMPLEMENTED | $41,903 | $12,294 |
$11,851
226,858
kWh
|
$25,138
-
kW-mo/yr
|
$4,914
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs