ITAC Assessment: CM1025
ITAC logo
ITAC Assessment: CM1025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Custom metal and poly parts/products.
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 44,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,644 1,229,440
kWh
Electricity Demand $49,300 2,565
kW-mo/yr
Electricity Fees $13,988 -
Natural Gas $5,133 477
MMBtu
Waste Disposal Costs
Water Usage $9,066 1,117
Tgal
TOTAL YEARLY COSTS $135,131
RECOMMENDED SAVINGS* $49,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $34,270 $526,058 $32,056
683,695
kWh
$2,214
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $5,141 $28,827 $3,796
80,941
kWh
$1,345
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $6,196 $889 $2,295
48,942
kWh
$3,901
-
kW-mo/yr
04 2.4224: Upgrade controls on compressors $2,954 $22,704 $1,892
40,338
kWh
$1,062
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $1,162 $2,172 $1,162
24,779
kWh
-
TOTAL RECOMMENDED $49,723 $580,650 $41,201
878,695
kWh
$8,522
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs