ITAC Assessment: LE0363
ITAC logo
ITAC Assessment: LE0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $50
M
to 100
M
# of Employees 99
Plant Area 270,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 2,574
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,455 8,728,816
kWh
Electricity Demand $67,848 18,980
kW-mo/yr
Electricity Fees $271,602 -
Natural Gas $238,756 37,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $59,031 $85,300 $44,272
1,029,600
kWh
$6,426
-
kW-mo/yr
- $8,333
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,371 $13,013 $1,992
46,330
kWh
$496
-
kW-mo/yr
- $883
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,725 $20,280 $11,589
269,508
kWh
$1,482
-
kW-mo/yr
- $654
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,978 $1,000 $4,347
101,089
kWh
$631
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,529 $2,139 $212
4,922
kWh
$1,317
-
kW-mo/yr
- -
06 2.7232: Replace existing hvac unit with high efficiency model $6,405 $21,000 $5,283
122,850
kWh
$50
-
kW-mo/yr
$1,072
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,878 $3,800 $1,139
26,482
kWh
$739
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,215 $24,200 $6,476
150,616
kWh
$739
-
kW-mo/yr
- -
09 2.2443: Re-use or recycle hot or cold process exhaust air $13,848 $6,600 - - $13,848
-
MMBtu
-
10 2.2443: Re-use or recycle hot or cold process exhaust air $4,751 $5,000 - - $4,751
-
MMBtu
-
11 2.2443: Re-use or recycle hot or cold process exhaust air $4,613 $14,000 - - $4,613
-
MMBtu
-
12 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $29,646 $29,648 $17,632
410,041
kWh
- $12,014
-
MMBtu
-
TOTAL RECOMMENDED $150,990 $225,980 $92,942
2,161,438
kWh
$11,880
-
kW-mo/yr
$36,298
-
MMBtu
$9,870
TOTAL IMPLEMENTED $67,416 $92,239 $49,970
1,162,093
kWh
$9,113
-
kW-mo/yr
- $8,333
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs