ITAC Assessment: UU0172
ITAC logo
ITAC Assessment: UU0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Flexible packaging and labels
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 40,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,032
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,339 1,306,550
kWh
Electricity Demand $63,581 3,680
kW-mo/yr
Electricity Fees $20,051 -
Natural Gas $29,821 4,774
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $21,173 624,000
lb
TOTAL YEARLY COSTS $198,966
RECOMMENDED SAVINGS* $34,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,439 $15,243 $6,439
131,400
kWh
- - - -
02 3.6192: Use a less expensive method of waste removal $5,200 $5,000 - - - - $5,200
-
lb
03 2.3212: Optimize plant power factor $4,999 $3,792 - - $4,999 - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,803 $4,803 $4,803
98,020
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,814 $7,952 $2,572
52,492
kWh
$1,242
-
kW-mo/yr
- - -
06 2.2622: Replace existing chiller with high efficiency model $3,039 $17,334 $1,278
26,081
kWh
$1,761
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,543 $100 $1,715
34,995
kWh
$828
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,268 $212 $1,853
37,815
kWh
$415
-
kW-mo/yr
- - -
09 2.6212: Turn off equipment during breaks, reduce operating time $1,679 $1,200 - - - $1,679
-
MMBtu
-
TOTAL RECOMMENDED $34,784 $55,636 $18,660
380,803
kWh
$4,247
-
kW-mo/yr
$4,999 $1,679
-
MMBtu
$5,200
-
lb
TOTAL IMPLEMENTED $19,782 $42,041 $13,857
282,783
kWh
$4,247
-
kW-mo/yr
- $1,679
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs