ITAC Assessment: CM1022
ITAC logo
ITAC Assessment: CM1022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Decorative Stone Facade
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 65,100
ft2
Annual Production 276,000
units
Production Hrs. Annual 2,366
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,474 310,000
kWh
Electricity Demand $29,990 1,224
kW-mo/yr
Electricity Fees $4,635 -
Natural Gas $26,706 2,801
MMBtu
TOTAL YEARLY COSTS $83,805
RECOMMENDED SAVINGS* $33,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $10,354 $115,732 $9,570
131,998
kWh
$784
-
kW-mo/yr
- -
02 2.7232: Replace existing hvac unit with high efficiency model $8,106 $92,608 $3,586
49,458
kWh
$4,520
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $3,609 $32,760 $1,396
19,257
kWh
$2,213
-
kW-mo/yr
- -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,255 $4,988 $1,344
18,533
kWh
$2,911
-
kW-mo/yr
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,995 $2,168 $451
6,037
kWh
$1,545
-
kW-mo/yr
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $3,118 $1,776 $407
5,612
kWh
- $2,711
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $2,174 $8,000 - - - $2,174
TOTAL RECOMMENDED $33,611 $258,032 $16,754
230,895
kWh
$11,973
-
kW-mo/yr
$2,711
-
MMBtu
$2,174
TOTAL IMPLEMENTED $8,106 $92,608 $3,586
49,458
kWh
$4,520
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs