Assessment Year | 2023 |
---|---|
Principal Product | Decorative Stone Facade |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
65,100
ft2
|
Annual Production | 276,000
units
|
Production Hrs. Annual | 2,366
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,474 | 310,000 |
kWh
|
$0.072 |
Electricity Demand | $29,990 | 1,224 |
kW-mo/yr
|
$24.50 |
Electricity Fees | $4,635 | - |
|
- |
Natural Gas | $26,706 | 2,801 |
MMBtu
|
$9.53 |
TOTAL YEARLY COSTS | $83,805 | |||
RECOMMENDED SAVINGS* | $33,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,106 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $10,354 | $115,732 |
$9,570
131,998
kWh
|
$784
-
kW-mo/yr
|
- | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $8,106 | $92,608 |
$3,586
49,458
kWh
|
$4,520
-
kW-mo/yr
|
- | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $3,609 | $32,760 |
$1,396
19,257
kWh
|
$2,213
-
kW-mo/yr
|
- | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $4,255 | $4,988 |
$1,344
18,533
kWh
|
$2,911
-
kW-mo/yr
|
- | - | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,995 | $2,168 |
$451
6,037
kWh
|
$1,545
-
kW-mo/yr
|
- | - | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,118 | $1,776 |
$407
5,612
kWh
|
- |
$2,711
-
MMBtu
|
- | |
07 | 2.8121: Apply for tax-free status for energy purchases | $2,174 | $8,000 | - | - | - | $2,174 | |
TOTAL RECOMMENDED | $33,611 | $258,032 |
$16,754
230,895
kWh
|
$11,973
-
kW-mo/yr
|
$2,711
-
MMBtu
|
$2,174 | ||
TOTAL IMPLEMENTED | $8,106 | $92,608 |
$3,586
49,458
kWh
|
$4,520
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs