Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Firelogs
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 45,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 2,185
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,084 601,700
kWh
Electricity Demand $30,150 3,970
kW-mo/yr
Electricity Fees $215 -
Natural Gas $59,444 9,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $259,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $251,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $8,498 $(-2,645.0) $8,374
118,113
kWh
$124
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $20,608 $2,945 - - $20,608
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $731 $200 $731
10,844
kWh
- - -
04 4.113: Install refrigeration system to cool product $230,000 $40,000 - - - $230,000
TOTAL RECOMMENDED $259,837 $40,500 $9,105
128,957
kWh
$124
-
kW-mo/yr
$20,608
-
MMBtu
$230,000
TOTAL IMPLEMENTED $251,339 $43,145 $731
10,844
kWh
- $20,608
-
MMBtu
$230,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs