ITAC Assessment: CM1014
ITAC logo
ITAC Assessment: CM1014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aluminum Forgings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 58,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,669 970,000
kWh
Electricity Demand $60,753 3,431
kW-mo/yr
Electricity Fees $10,704 -
Natural Gas $29,312 3,034
MMBtu
TOTAL YEARLY COSTS $141,438
RECOMMENDED SAVINGS* $86,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $75,700 $662,500 $39,600
945,800
kWh
$36,100
-
kW-mo/yr
-
02 2.7231: Use radiant heater for spot heating $5,400 $3,600 - - $5,400
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $4,968 $600 $50
1,194
kWh
$4,918
-
kW-mo/yr
-
04 2.7444: Close holes and openings in building such as broken windows $400 $1,500 - - $400
-
MMBtu
TOTAL RECOMMENDED $86,468 $668,200 $39,650
946,994
kWh
$41,018
-
kW-mo/yr
$5,800
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs