ITAC Assessment: CL2112
ITAC logo
ITAC Assessment: CL2112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 66,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 3,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,227 1,690,891
kWh
Electricity Demand $8,130 5,081
kW-mo/yr
Electricity Fees $7,010 -
Natural Gas $3,252 28,093
MMBtu
Waste Disposal Costs
Water Usage $1,618 100
Tgal
Water Disposal $1,713 100
Tgal
TOTAL YEARLY COSTS $122,950
RECOMMENDED SAVINGS* $6,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $2,080 $5,100 $2,080
34,673
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,367 - $1,367
22,604
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $293 $260 $293
2,657
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,967 $17,500 $2,562
42,696
kWh
$405
-
kW-mo/yr
05 2.6121: Reduce hot water temperature to the minimum required $192 - $192
3,204
kWh
-
TOTAL RECOMMENDED $6,900 $22,860 $6,494
105,834
kWh
$405
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs