| Assessment Year | 2021 |
|---|---|
| Principal Product | Railroad Products |
| NAICS | 336510: Railroad Rolling Stock Manufacturing |
| SIC | 3743: Railroad Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 412 |
| Plant Area |
215,000
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 5,952
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $185,172 | 5,266,000 |
kWh
|
$0.035 | |
| Electricity Demand | $147,389 | 12,600 |
kW-mo/yr
|
$11.70 | |
| Electricity Fees | $1,461 | - |
|
- | |
| Natural Gas | $10,142 | 1,432 |
MMBtu
|
$7.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,599 | 1,315 |
Tgal
|
$4.26 | |
| Water Disposal | $7,539 | 1,315 |
Tgal
|
$5.73 | |
| TOTAL YEARLY COSTS | $357,302 | ||||
| RECOMMENDED SAVINGS* | $79,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,610 | - |
$2,278
56,940
kWh
|
$1,332
-
kW-mo/yr
|
|
| 02 | 2.7135: Install occupancy sensors | $2,121 | $3,410 |
$2,121
53,025
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $32,430 | - |
$32,430
810,767
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,250 | - |
$6,409
160,233
kWh
|
$841
-
kW-mo/yr
|
|
| 05 | 2.6218: Turn off equipment when not in use | $105 | - |
$105
2,628
kWh
|
- | |
| 06 | 2.7442: Keep doors and windows shut when not on use | $1,221 | - |
$1,221
30,516
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $32,866 | - |
$32,866
821,639
kWh
|
- | |
| TOTAL RECOMMENDED | $79,603 | $3,410 |
$77,430
1,935,748
kWh
|
$2,173
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs