| Assessment Year | 2019 |
|---|---|
| Principal Product | Clean Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 25 |
| Plant Area |
25,000
ft2
|
| Annual Production | 1,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $412,568 | 5,532,500 |
kWh
|
$0.075 | |
| Electricity Demand | $110,852 | 12,348 |
kW-mo/yr
|
$8.98 | |
| Electricity Fees | $7,394 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $1,892 | 91 |
Tgal
|
$20.79 | |
| Water Disposal | $1 | 91 |
Tgal
|
$0.011 | |
| TOTAL YEARLY COSTS | $532,707 | ||||
| RECOMMENDED SAVINGS* | $305,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $46,508 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,521 | $22,682 |
$17,192
229,221
kWh
|
$6,329
-
kW-mo/yr
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,987 | $32,413 |
$17,312
230,825
kWh
|
$5,675
-
kW-mo/yr
|
|
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $4,338 | $12,000 |
$4,338
57,840
kWh
|
- | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $162,118 | $350,000 |
$139,275
1,857,000
kWh
|
$22,843
-
kW-mo/yr
|
|
| 05 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $92,958 | $400,000 |
$79,860
1,064,795
kWh
|
$13,098
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $305,922 | $817,095 |
$257,977
3,439,681
kWh
|
$47,945
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $46,508 | $55,095 |
$34,504
460,046
kWh
|
$12,004
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs