ITAC Assessment: CL1701
ITAC logo
ITAC Assessment: CL1701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Textiles, Screen Printing, Filtration
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 250,000
ft2
Annual Production 2,538,623
pieces
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,619 4,402,900
kWh
Electricity Demand $13,460 1,345
kW-mo/yr
Electricity Fees $0.1 -
Natural Gas $81,089 9,194
MMBtu
TOTAL YEARLY COSTS $445,168
RECOMMENDED SAVINGS* $89,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $36,942 $10,000 $36,942
450,518
kWh
-
02 2.7261: Install timers and/or thermostats $18,050 $250 $18,050
220,122
kWh
-
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $12,535 $3,650 $12,535
152,866
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,647 $22,515 $11,647
98,854
kWh
-
05 2.2421: Install waste heat boiler to provide direct power $5,838 $13,500 - $5,838
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,382 $6,000 $4,382
53,435
kWh
-
TOTAL RECOMMENDED $89,394 $55,915 $83,556
975,795
kWh
$5,838
-
MMBtu
TOTAL IMPLEMENTED $66,962 $49,665 $61,124
702,238
kWh
$5,838
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs