ITAC Assessment: CI0084
ITAC logo
ITAC Assessment: CI0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Full-Service Restaurant
NAICS 722511: Full-Service Restaurants
SIC 5812: Eating Places
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 8,927
ft2
Annual Production 1,000
units
Production Hrs. Annual 5,840
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,091 244,625
kWh
Electricity Demand $11,062 779
kW-mo/yr
Electricity Fees $28,939 -
Natural Gas $22,008 1,589
MMBtu
Other Gas $2,290 1
MMBtu
Waste Disposal Costs
Water Usage $12,598 1,669
Tgal
Water Disposal $19,492 1,669
Tgal
Other Liquid (non-haz) $5,769 1
gal
TOTAL YEARLY COSTS $132,249
RECOMMENDED SAVINGS* $59,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $31,147 $445,859 $27,390
228,252
kWh
$3,757
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $10,735 $73,300 $4,662
38,852
kWh
$6,073
-
kW-mo/yr
- - -
03 2.7212: Install or upgrade insulation on hvac distribution systems $5,030 $7,500 $(-1,572.0)
(-13,104)
kWh
- $6,602
-
MMBtu
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $2,758 $8,000 - - $2,758
-
MMBtu
- -
05 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,569 $22,450 $2,569
21,405
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,892 $1,837 $1,521
12,679
kWh
$371
-
kW-mo/yr
- - -
07 2.7491: Insulate glazing, walls, ceilings, and roofs $1,874 $9,209 $1,874
15,620
kWh
- - - -
08 2.2442: Preheat combustion air with waste heat $1,255 $6,000 $1,009
8,409
kWh
$246
-
kW-mo/yr
- - -
09 2.6231: Utilize controls to operate equipment only when needed $943 $200 $432
3,600
kWh
$511
-
kW-mo/yr
- - -
10 2.7134: Use photocell controls $882 $900 $405
3,379
kWh
$362
-
kW-mo/yr
- $82 $33
TOTAL RECOMMENDED $59,085 $575,255 $38,290
319,092
kWh
$11,320
-
kW-mo/yr
$9,360
-
MMBtu
$82 $33
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs