| Assessment Year | 2026 |
|---|---|
| Principal Product | Full-Service Restaurant |
| NAICS | 722511: Full-Service Restaurants |
| SIC | 5812: Eating Places |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
8,927
ft2
|
| Annual Production | 1,000
units
|
| Production Hrs. Annual | 5,840
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $30,091 | 244,625 |
kWh
|
$0.12 | |
| Electricity Demand | $11,062 | 779 |
kW-mo/yr
|
$14.20 | |
| Electricity Fees | $28,939 | - |
|
- | |
| Natural Gas | $22,008 | 1,589 |
MMBtu
|
$13.85 | |
| Other Gas | $2,290 | 1 |
MMBtu
|
$2,290.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $12,598 | 1,669 |
Tgal
|
$7.55 | |
| Water Disposal | $19,492 | 1,669 |
Tgal
|
$11.68 | |
| Other Liquid (non-haz) | $5,769 | 1 |
gal
|
$5,769.00 | |
| TOTAL YEARLY COSTS | $132,249 | ||||
| RECOMMENDED SAVINGS* | $59,085 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $31,147 | $445,859 |
$27,390
228,252
kWh
|
$3,757
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $10,735 | $73,300 |
$4,662
38,852
kWh
|
$6,073
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7212: Install or upgrade insulation on hvac distribution systems | $5,030 | $7,500 |
$(-1,572.0)
(-13,104)
kWh
|
- |
$6,602
-
MMBtu
|
- | - | |
| 04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,758 | $8,000 | - | - |
$2,758
-
MMBtu
|
- | - | |
| 05 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $2,569 | $22,450 |
$2,569
21,405
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,892 | $1,837 |
$1,521
12,679
kWh
|
$371
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,874 | $9,209 |
$1,874
15,620
kWh
|
- | - | - | - | |
| 08 | 2.2442: Preheat combustion air with waste heat | $1,255 | $6,000 |
$1,009
8,409
kWh
|
$246
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $943 | $200 |
$432
3,600
kWh
|
$511
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.7134: Use photocell controls | $882 | $900 |
$405
3,379
kWh
|
$362
-
kW-mo/yr
|
- | $82 | $33 | |
| TOTAL RECOMMENDED | $59,085 | $575,255 |
$38,290
319,092
kWh
|
$11,320
-
kW-mo/yr
|
$9,360
-
MMBtu
|
$82 | $33 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs