ITAC Assessment: CI0078
ITAC logo
ITAC Assessment: CI0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Office Building
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,915
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,087 891,794
kWh
TOTAL YEARLY COSTS $231,087
RECOMMENDED SAVINGS* $88,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9114: Use solar heat to make electricty $33,943 $124,720 $33,943
130,550
kWh
02 4.662: Level one – add communication using iiot devices to existing control system to modify operations $28,448 $7,760 $28,448
109,416
kWh
03 2.1224: Replace boiler $13,617 $40,000 $13,617
52,372
kWh
04 2.7313: Recycle air for heating, ventilation and air conditioning $7,354 $18,000 $7,354
28,283
kWh
05 2.7261: Install timers and/or thermostats $3,677 $10,000 $3,677
14,141
kWh
06 2.7423: Reduce heat gain by window tinting $1,785 $4,000 $1,785
6,865
kWh
TOTAL RECOMMENDED $88,824 $204,480 $88,824
341,627
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs