| Assessment Year | 2026 |
|---|---|
| Principal Product | Hotel |
| NAICS | 721110: Hotels (except Casino Hotels) and Motels |
| SIC | 7011: Hotels and Motels |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
53,100
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $213,825 | 1,187,916 |
kWh
|
$0.18 | |
| Electricity Demand | $19,755 | 6,893 |
kW-mo/yr
|
$2.87 | |
| Electricity Fees | $34,706 | - |
|
- | |
| Natural Gas | $71,312 | 5,717 |
MMBtu
|
$12.47 | |
| Other Gas | $49,120 | 1 |
MMBtu
|
$49,120.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $121,399 | 8,850 |
Tgal
|
$13.72 | |
| Water Disposal | $78,636 | 8,850 |
Tgal
|
$8.89 | |
| TOTAL YEARLY COSTS | $588,753 | ||||
| RECOMMENDED SAVINGS* | $121,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1224: Replace boiler | $38,247 | $220,000 | - | - |
$38,247
-
MMBtu
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $21,383 | $92,000 |
$21,383
118,792
kWh
|
- | - | |
| 03 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $18,815 | $90,000 |
$18,815
104,526
kWh
|
- | - | |
| 04 | 2.7262: Separate controls of air handlers from ac/ heating systems | $12,701 | $29,600 |
$12,701
70,560
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $11,531 | $8,000 |
$11,531
64,060
kWh
|
- | - | |
| 06 | 2.2111: Install steam trap | $8,540 | $44,000 |
$7,934
44,077
kWh
|
$606
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,062 | $4,587 |
$7,890
43,835
kWh
|
$172
-
kW-mo/yr
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,453 | $3,000 |
$2,350
13,059
kWh
|
$103
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $121,732 | $491,187 |
$82,604
458,909
kWh
|
$881
-
kW-mo/yr
|
$38,247
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs