| Assessment Year | 2026 |
|---|---|
| Principal Product | Hotel |
| NAICS | 721110: Hotels (except Casino Hotels) and Motels |
| SIC | 7011: Hotels and Motels |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
36,500
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $14,698 | 275,732 |
kWh
|
$0.053 |
| Electricity Demand | $22,435 | 713 |
kW-mo/yr
|
$31.47 |
| Electricity Fees | $4,338 | - |
|
- |
| Natural Gas | $13,297 | 790 |
MMBtu
|
$16.83 |
| Other Gas | $1,919 | 1 |
MMBtu
|
$1,919.00 |
| TOTAL YEARLY COSTS | $56,687 | |||
| RECOMMENDED SAVINGS* | $30,677 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $12,857 | $130,906 |
$7,306
137,078
kWh
|
$5,551
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,270 | $9,000 |
$3,564
66,874
kWh
|
$2,706
-
kW-mo/yr
|
- | |
| 03 | 2.7212: Install or upgrade insulation on hvac distribution systems | $5,321 | $7,800 | - | - |
$5,321
-
MMBtu
|
|
| 04 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $3,643 | $22,500 |
$3,643
68,340
kWh
|
- | - | |
| 05 | 2.7262: Separate controls of air handlers from ac/ heating systems | $2,586 | $600 |
$2,586
48,522
kWh
|
- | - | |
| TOTAL RECOMMENDED | $30,677 | $170,806 |
$17,099
320,814
kWh
|
$8,257
-
kW-mo/yr
|
$5,321
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs