ITAC Assessment: CI0065
ITAC logo
ITAC Assessment: CI0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 36,500
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,698 275,732
kWh
Electricity Demand $22,435 713
kW-mo/yr
Electricity Fees $4,338 -
Natural Gas $13,297 790
MMBtu
Other Gas $1,919 1
MMBtu
TOTAL YEARLY COSTS $56,687
RECOMMENDED SAVINGS* $30,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $12,857 $130,906 $7,306
137,078
kWh
$5,551
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,270 $9,000 $3,564
66,874
kWh
$2,706
-
kW-mo/yr
-
03 2.7212: Install or upgrade insulation on hvac distribution systems $5,321 $7,800 - - $5,321
-
MMBtu
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $3,643 $22,500 $3,643
68,340
kWh
- -
05 2.7262: Separate controls of air handlers from ac/ heating systems $2,586 $600 $2,586
48,522
kWh
- -
TOTAL RECOMMENDED $30,677 $170,806 $17,099
320,814
kWh
$8,257
-
kW-mo/yr
$5,321
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs