ITAC Assessment: CI0048
ITAC logo
ITAC Assessment: CI0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Emergency Shelter
NAICS 624230: Emergency and Other Relief Services
SIC 8322: Individual and Family Social Services
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 32,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,698 148,107
kWh
Electricity Demand $19,940 835
kW-mo/yr
Electricity Fees $3,462 -
Natural Gas $3,289 2,256
MMBtu
Other Gas $789 1
MMBtu
TOTAL YEARLY COSTS $49,178
RECOMMENDED SAVINGS* $89,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $54,215 $280,743 $44,895
306,446
kWh
$9,320
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,034 $1,595 $8,204
55,998
kWh
$1,830
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $6,546 $32,000 $1,736
11,849
kWh
$4,810
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $5,329 $2,160 $5,329
36,378
kWh
-
05 2.7135: Install occupancy sensors $4,884 $3,750 $3,772
25,749
kWh
$1,112
-
kW-mo/yr
06 2.7491: Insulate glazing, walls, ceilings, and roofs $3,445 $1,536 $3,445
23,516
kWh
-
07 2.7134: Use photocell controls $2,640 $2,150 $1,275
8,704
kWh
$1,365
-
kW-mo/yr
08 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,170 $18,100 $2,170
14,811
kWh
-
TOTAL RECOMMENDED $89,263 $342,034 $70,826
483,451
kWh
$18,437
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs