ITAC Assessment: CI0034
ITAC logo
ITAC Assessment: CI0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Office Facility
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 426,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,779 8,265,498
kWh
Electricity Demand $211,471 14,643
kW-mo/yr
Electricity Fees $101,209 -
Natural Gas $28,767 6,334
MMBtu
Waste Disposal Costs
Water Usage $36,289 6,880
Tgal
Water Disposal $10,481 6,880
Tgal
TOTAL YEARLY COSTS $814,996
RECOMMENDED SAVINGS* $540,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $460,108 $5,410,149 $305,103
5,912,843
kWh
$155,005
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $21,158 $11,650 $9,732
188,599
kWh
$11,426
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $19,192 $63,000 $19,192
371,947
kWh
- -
04 2.6218: Turn off equipment when not in use $12,048 - $6,650
128,880
kWh
$5,398
-
kW-mo/yr
-
05 2.7262: Separate controls of air handlers from ac/ heating systems $7,514 $7,600 $7,514
145,620
kWh
- -
06 2.6218: Turn off equipment when not in use $7,472 $3,000 $3,427
66,424
kWh
$3,879
-
kW-mo/yr
$166
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,253 $2,500 $4,520
87,600
kWh
$1,733
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $3,986 $375 $2,790
54,078
kWh
$1,196
-
kW-mo/yr
-
09 2.3132: Recharge batteries on during off-peak demand periods $1,693 $45 - $1,693
-
kW-mo/yr
-
10 2.1321: Replace fossil fuel equipment with electrical equipment $973 $6,000 $973
18,850
kWh
- -
TOTAL RECOMMENDED $540,397 $5,504,319 $359,901
6,974,841
kWh
$180,330
-
kW-mo/yr
$166
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs