ITAC Assessment: CI0032
ITAC logo
ITAC Assessment: CI0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen Fruit Popsicles
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 18,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 1,950
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,045 544,231
kWh
Electricity Demand $36,605 2,291
kW-mo/yr
Electricity Fees $10,697 -
Natural Gas $2,757 276
MMBtu
TOTAL YEARLY COSTS $146,104
RECOMMENDED SAVINGS* $88,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $47,412 $313,000 $42,378
240,100
kWh
$5,034
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $10,726 $2,419 $10,726
60,772
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $9,326 $24,000 $5,426
30,743
kWh
- $3,900
04 2.7491: Insulate glazing, walls, ceilings, and roofs $8,168 $13,563 $8,168
46,276
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,401 - $5,238
29,676
kWh
$163
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,536 $22,885 $4,101
23,237
kWh
$435
-
kW-mo/yr
-
07 2.3132: Recharge batteries on during off-peak demand periods $1,346 $100 - $1,346
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $1,100 $2,025 $776
4,397
kWh
$324
-
kW-mo/yr
-
09 2.4133: Use most efficient type of electric motors $454 $1,050 $320
1,812
kWh
$134
-
kW-mo/yr
-
TOTAL RECOMMENDED $88,469 $379,042 $77,133
437,013
kWh
$7,436
-
kW-mo/yr
$3,900
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs