Assessment Year | 2023 |
---|---|
Principal Product | Municipal Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 17 |
Plant Area |
37,028
ft2
|
Annual Production | 1,022,100
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $403,216 | 2,716,800 |
kWh
|
$0.15 |
Electricity Demand | $44,472 | 5,097 |
kW-mo/yr
|
$8.73 |
Electricity Fees | $2,676 | - |
|
- |
Fuel Oil #2 | $78,861 | 2,872 |
MMBtu
|
$27.46 |
TOTAL YEARLY COSTS | $529,225 | |||
RECOMMENDED SAVINGS* | $172,451 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $98,833 | $861,320 |
$42,064
284,215
kWh
|
$7,338
-
kW-mo/yr
|
$49,431 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $54,846 | $17,375 |
$50,745
342,872
kWh
|
$4,101
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,273 | $19,000 |
$9,505
64,226
kWh
|
$768
-
kW-mo/yr
|
- | |
04 | 2.7234: Use heat pump for space conditioning | $7,254 | $18,500 |
$6,242
42,179
kWh
|
$1,012
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,245 | $1,250 |
$1,149
7,766
kWh
|
$96
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $172,451 | $917,445 |
$109,705
741,258
kWh
|
$13,315
-
kW-mo/yr
|
$49,431 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs