ITAC Assessment: MA0861
ITAC logo
ITAC Assessment: MA0861
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Municipal Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area 37,028
ft2
Annual Production 1,022,100
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,216 2,716,800
kWh
Electricity Demand $44,472 5,097
kW-mo/yr
Electricity Fees $2,676 -
Fuel Oil #2 $78,861 2,872
MMBtu
TOTAL YEARLY COSTS $529,225
RECOMMENDED SAVINGS* $172,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $98,833 $861,320 $42,064
284,215
kWh
$7,338
-
kW-mo/yr
$49,431
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,846 $17,375 $50,745
342,872
kWh
$4,101
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,273 $19,000 $9,505
64,226
kWh
$768
-
kW-mo/yr
-
04 2.7234: Use heat pump for space conditioning $7,254 $18,500 $6,242
42,179
kWh
$1,012
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,245 $1,250 $1,149
7,766
kWh
$96
-
kW-mo/yr
-
TOTAL RECOMMENDED $172,451 $917,445 $109,705
741,258
kWh
$13,315
-
kW-mo/yr
$49,431
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs