ITAC Assessment: CI0030
ITAC logo
ITAC Assessment: CI0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Table Linen Manufacturing
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 57,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 1,664
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,845 352,920
kWh
Electricity Demand $18,596 1,551
kW-mo/yr
Electricity Fees $14,067 -
Natural Gas $64,552 6,455
MMBtu
Waste Disposal Costs
Water Usage $23,155 4,229,940
Tgal
TOTAL YEARLY COSTS $163,215
RECOMMENDED SAVINGS* $66,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $21,581 $101,332 $18,298
150,726
kWh
$3,283
-
kW-mo/yr
-
02 2.2113: Repair or replace steam traps $15,868 $1,600 - - $15,868
-
MMBtu
03 2.7135: Install occupancy sensors $8,384 $3,000 $5,021
41,367
kWh
$3,363
-
kW-mo/yr
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $4,601 $18,900 - - $4,601
-
MMBtu
05 2.2511: Insulate bare equipment $4,265 $2,565 - - $4,265
-
MMBtu
06 2.4133: Use most efficient type of electric motors $3,914 $1,600 $2,017
16,617
kWh
$1,897
-
kW-mo/yr
-
07 2.7134: Use photocell controls $3,830 $1,500 $1,168
9,620
kWh
$2,662
-
kW-mo/yr
-
08 2.2135: Repair and eliminate steam leaks $2,431 $4,000 - - $2,431
-
MMBtu
09 2.2437: Recover waste heat from equipment $2,030 $5,000 - - $2,030
-
MMBtu
TOTAL RECOMMENDED $66,904 $139,497 $26,504
218,330
kWh
$11,205
-
kW-mo/yr
$29,195
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs