ITAC Assessment: CI0029
ITAC logo
ITAC Assessment: CI0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen and Refrigerated Foods
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 434,818
ft2
Annual Production 1,260,300,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,175,823 7,268,249
kWh
Electricity Demand $457,583 18,380
kW-mo/yr
Electricity Fees $69,647 -
TOTAL YEARLY COSTS $1,703,053
RECOMMENDED SAVINGS* $467,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $206,557 $365,000 $206,557
1,276,618
kWh
-
02 2.3132: Recharge batteries on during off-peak demand periods $127,600 $20,500 - $127,600
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $91,545 $1,500 $79,048
488,554
kWh
$12,497
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $29,727 - $24,552
151,740
kWh
$5,175
-
kW-mo/yr
05 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $11,759 $38,400 $11,759
72,682
kWh
-
TOTAL RECOMMENDED $467,188 $425,400 $321,916
1,989,594
kWh
$145,272
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs