ITAC Assessment: CI0026
ITAC logo
ITAC Assessment: CI0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial Laundry Service
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range less than $500
k
# of Employees 50
Plant Area 58,063
ft2
Annual Production 1
units
Production Hrs. Annual 3,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,427 692,640
kWh
Electricity Demand $36,997 7,578
kW-mo/yr
Electricity Fees $34,809 -
Natural Gas $356,242 20,815
MMBtu
LPG $32,000 6,020
MMBtu
Waste Disposal Costs
Water Usage $36,753 16,261
Tgal
TOTAL YEARLY COSTS $559,228
RECOMMENDED SAVINGS* $79,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.1224: Replace boiler $40,642 $20,000 $(-3,239.0)
(-35,952)
kWh
$(-328.0)
-
kW-mo/yr
$44,209
-
MMBtu
- - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $21,942 $60,000 $(-9,619.0)
(-106,763)
kWh
$(-439.0)
-
kW-mo/yr
- $32,000
-
MMBtu
- -
03 2.9114: Use solar heat to make electricty $6,141 $80,118 $5,608
62,244
kWh
$533
-
kW-mo/yr
- - - -
04 2.7134: Use photocell controls $3,866 $2,700 $2,360
26,194
kWh
$930
-
kW-mo/yr
- - $262 $314
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,454 $2,400 $2,999
33,286
kWh
$455
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,873 $8,074 $2,389
26,521
kWh
$484
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $500 $2,000 $416
4,614
kWh
$84
-
kW-mo/yr
- - - -
08 2.7262: Separate controls of air handlers from ac/ heating systems $458 $400 $458
5,088
kWh
- - - - -
TOTAL RECOMMENDED $79,876 $175,692 $1,372
15,232
kWh
$1,719
-
kW-mo/yr
$44,209
-
MMBtu
$32,000
-
MMBtu
$262 $314
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs