| Assessment Year | 2023 |
|---|---|
| Principal Product | PVC and CPVC Piping |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 37 |
| Plant Area |
166,000
ft2
|
| Annual Production | 19,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $512,777 | 2,110,307 |
kWh
|
$0.24 | |
| Natural Gas | $124,876 | 26,095 |
MMBtu
|
$4.79 | |
| LPG | $96,000 | 395 |
MMBtu
|
$243.04 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,196 | 2,038 |
Tgal
|
$1.57 | |
| TOTAL YEARLY COSTS | $736,849 | ||||
| RECOMMENDED SAVINGS* | $235,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $76,570 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $92,262 | $487,880 |
$92,262
379,680
kWh
|
- | - | |
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $76,570 | $180,000 |
$(-19,430.0)
(-79,960)
kWh
|
- |
$96,000
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $55,349 | $45,000 |
$55,349
227,774
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $6,503 | $2,870 |
$6,503
26,666
kWh
|
- | - | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $3,187 | $20,000 | - |
$3,187
-
MMBtu
|
- | |
| 06 | 2.7134: Use photocell controls | $1,246 | $750 |
$1,246
5,088
kWh
|
- | - | |
| TOTAL RECOMMENDED | $235,117 | $736,500 |
$135,930
559,248
kWh
|
$3,187
-
MMBtu
|
$96,000
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $76,570 | $180,000 |
$(-19,430.0)
(-79,960)
kWh
|
- |
$96,000
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs