ITAC Assessment: CI0018
ITAC logo
ITAC Assessment: CI0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Academic Service
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 122
Plant Area 216,563
ft2
Annual Production 1
units
Production Hrs. Annual 1,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,721 1,585,714
kWh
Electricity Demand $111,413 6,474
kW-mo/yr
Electricity Fees $1,389 -
Natural Gas $151,392 8,337
MMBtu
Waste Disposal Costs
Water Usage $24,262 9,397
Tgal
TOTAL YEARLY COSTS $543,177
RECOMMENDED SAVINGS* $349,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.3141: Use battery storage for demand control $117,675 $50,000 $49,905
309,586
kWh
$67,770
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $92,259 $619,600 $77,803
482,650
kWh
$14,456
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $15,348 $2,000 $12,415
77,021
kWh
$2,933
-
kW-mo/yr
-
04 2.1321: Replace fossil fuel equipment with electrical equipment $8,202 $40,000 $8,202
50,877
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $112,267 $176,800 $6,187
52,134
kWh
- $106,080
06 2.4322: Use or replace with energy efficient substitutes $3,377 $45,000 $3,377
10,890
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $1,600 $193
1,200
kWh
$413
-
kW-mo/yr
-
TOTAL RECOMMENDED $349,734 $935,000 $158,082
984,358
kWh
$85,572
-
kW-mo/yr
$106,080
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs