| Assessment Year | 2023 |
|---|---|
| Principal Product | Academic Services |
| NAICS | 611110: Elementary and Secondary Schools |
| SIC | 8211: Elementary and Secondary Schools |
| Sales Range | $1 M to 5M |
| # of Employees | 68 |
| Plant Area |
43,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 3,443
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $162,441 | 579,000 |
kWh
|
$0.28 | |
| Electricity Fees | $20,479 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $2,210 | 219 |
Tgal
|
$10.09 | |
| Water Disposal | $1,586 | 219 |
Tgal
|
$7.24 | |
| TOTAL YEARLY COSTS | $186,716 | ||||
| RECOMMENDED SAVINGS* | $113,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $74,204 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,109 | $26,411 |
$42,109
150,068
kWh
|
|
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $14,087 | $30,000 |
$14,087
50,203
kWh
|
|
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $12,997 | $44,000 |
$12,997
46,320
kWh
|
|
| 04 | 2.9114: Use solar heat to make electricty | $10,477 | $35,642 |
$10,477
37,338
kWh
|
|
| 05 | 2.7291: Reschedule and rearrange multiple-source heating systems | $9,748 | $5,000 |
$9,748
34,740
kWh
|
|
| 06 | 2.7135: Install occupancy sensors | $8,621 | $5,200 |
$8,621
30,725
kWh
|
|
| 07 | 2.7262: Separate controls of air handlers from ac/ heating systems | $8,233 | $4,400 |
$8,233
29,340
kWh
|
|
| 08 | 2.7134: Use photocell controls | $7,117 | $3,300 |
$7,117
24,480
kWh
|
|
| TOTAL RECOMMENDED | $113,389 | $153,953 |
$113,389
403,214
kWh
|
||
| TOTAL IMPLEMENTED | $74,204 | $111,253 |
$74,204
264,451
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs