Assessment Year | 2023 |
---|---|
Principal Product | Industrial Laundry |
NAICS | 812332: Industrial Launderers |
SIC | 7218: Industrial Launderers |
Sales Range | less than $500 k |
# of Employees | 62 |
Plant Area |
38,500
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 4,718
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $147,728 | 952,116 |
kWh
|
$0.16 | |
Electricity Demand | $170,433 | 7,260 |
kW-mo/yr
|
$23.48 | |
Natural Gas | $391,705 | 28,115 |
MMBtu
|
$13.93 | |
LPG | $32,000 | 2,857 |
MMBtu
|
$11.20 | |
Waste Disposal Costs | |||||
Water Usage | $174,439 | 25,112 |
Tgal
|
$6.95 | |
TOTAL YEARLY COSTS | $916,305 | ||||
RECOMMENDED SAVINGS* | $200,976 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $34,809 | $305,300 |
$25,093
161,684
kWh
|
$9,716
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,989 | $15,565 |
$31,047
200,043
kWh
|
$11,942
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.1224: Replace boiler | $37,870 | $9,000 |
$(-8,201.0)
(-52,842)
kWh
|
$(-1,577.0)
-
kW-mo/yr
|
$47,648
-
MMBtu
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $27,121 | - |
$19,588
126,212
kWh
|
$7,533
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,946 | $2,400 |
$17,808
114,740
kWh
|
$5,138
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7134: Use photocell controls | $15,628 | $2,250 |
$8,245
53,122
kWh
|
$5,102
-
kW-mo/yr
|
- | - | $1,038 | $1,243 | |
07 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $13,319 | $60,000 |
$(-16,569.0)
(-106,763)
kWh
|
$(-2,112.0)
-
kW-mo/yr
|
- |
$32,000
-
MMBtu
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,109 | $3,000 |
$2,395
15,430
kWh
|
$1,714
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.7135: Install occupancy sensors | $1,704 | $2,000 |
$1,230
7,926
kWh
|
$474
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7262: Separate controls of air handlers from ac/ heating systems | $481 | $600 |
$481
3,099
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $200,976 | $400,115 |
$81,117
522,651
kWh
|
$37,930
-
kW-mo/yr
|
$47,648
-
MMBtu
|
$32,000
-
MMBtu
|
$1,038 | $1,243 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs