ITAC Assessment: CI0013
ITAC logo
ITAC Assessment: CI0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Laundry
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range less than $500
k
# of Employees 62
Plant Area 38,500
ft2
Annual Production 1
units
Production Hrs. Annual 4,718
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,728 952,116
kWh
Electricity Demand $170,433 7,260
kW-mo/yr
Natural Gas $391,705 28,115
MMBtu
LPG $32,000 2,857
MMBtu
Waste Disposal Costs
Water Usage $174,439 25,112
Tgal
TOTAL YEARLY COSTS $916,305
RECOMMENDED SAVINGS* $200,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $34,809 $305,300 $25,093
161,684
kWh
$9,716
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $42,989 $15,565 $31,047
200,043
kWh
$11,942
-
kW-mo/yr
- - - -
03 2.1224: Replace boiler $37,870 $9,000 $(-8,201.0)
(-52,842)
kWh
$(-1,577.0)
-
kW-mo/yr
$47,648
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $27,121 - $19,588
126,212
kWh
$7,533
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,946 $2,400 $17,808
114,740
kWh
$5,138
-
kW-mo/yr
- - - -
06 2.7134: Use photocell controls $15,628 $2,250 $8,245
53,122
kWh
$5,102
-
kW-mo/yr
- - $1,038 $1,243
07 2.8227: Adjust / maintain fork lift trucks for most efficient operation $13,319 $60,000 $(-16,569.0)
(-106,763)
kWh
$(-2,112.0)
-
kW-mo/yr
- $32,000
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,109 $3,000 $2,395
15,430
kWh
$1,714
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $1,704 $2,000 $1,230
7,926
kWh
$474
-
kW-mo/yr
- - - -
10 2.7262: Separate controls of air handlers from ac/ heating systems $481 $600 $481
3,099
kWh
- - - - -
TOTAL RECOMMENDED $200,976 $400,115 $81,117
522,651
kWh
$37,930
-
kW-mo/yr
$47,648
-
MMBtu
$32,000
-
MMBtu
$1,038 $1,243
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs